Residual Risk Assessment involves evaluating the remaining level of risk after implementing mitigation measures. This assessment helps determine if additional actions are needed to further reduce risk or if the current level is acceptable.
« Back to Glossary IndexResidual Risk Assessment
« Back to Glossary Index